Hybrid pontoon, steel pontoon
The JFE Hybrid Pontoon consists of a composite plate and steel members.
The plate thickness can be reduced by using high-strength composite plates. Steel pontoons are also available, where the outer wall consists of steel plates only.
Features of the construction method
-
The plate thickness can be reduced and the weight can be reduced.
-
It can be installed in shallow water depths.
-
The inside of the box is completely watertight.
-
The steel plate on the concrete-coated inner surface is resistant to corrosion.
Hybrid Pontoons (Overview of Construction Method)
Composite plates and steel shell walls are used
⇒ Thin wall
⇒ Light weight allows for a smaller draft

Construction examples

Name of construction work | Floating pier in Kanda Port |
---|---|
Client | Fukuoka Prefecture |
Purpose/function | Floating pier for mooring fishing vessels, etc. |
Year of construction | 2009 |
Dimensions | 52 m (length) × 41.8 m (width) × 22 m (height) |
Quantity (/case) | Dead weight = 156 tons |
Features/functions | Mooring method: Pile mooring Structure type: Steel |

Name of construction work | Nakagusuku Bay Port (Ajama area) Floating Jetty |
---|---|
Client | Okinawa Prefecture |
Purpose/function | Cruise ship landing/landing place |
Year of construction | 2006 |
Dimensions | 24.0 m (length) x 9.0 m (width) x 1.8 m (height) |
Number of units | 1 case |
Weight | 222 t/case |
Steel weight | 64 t/case |
Concrete volume | 44 m3 |
Design overview | Installation water depth -2.5 m, design wave height (H1/3) 1.12 m, dry port 0.8 m |
Features/functions | Composite structure, pile mooring |

Name of construction work | Sea fishing park maintenance work |
---|---|
Client | Osaki-cho, Hiroshima Prefecture |
Purpose/function | Fishing pier |
Year of construction | 2001 |
Dimensions | Height = 1.5m, width = 5.0m, length = 48.0m, draught = 0.5m |
Quantity (/case) | Dead weight = 76.8 tons |
Design overview | Installation water depth = '-7.0 m, design wave height = 0.93 m (H1/3) |
Features/functions | Chain mooring, ramp type connecting bridge |

Name of construction work | Pier construction work in International Exchange Zone of Yokohama Minato Mirai 21 area |
---|---|
Client | Port and Harbor Bureau, City of Yokohama |
Purpose/function | Waiting room/Restaurant |
Year of construction | 1991 |
Dimensions | Height = 3.2 m, width = 24.0 m, length = 24.0 m, draught = 2.0 m |
Quantity (/case) | Full load displacement = 1200 tons (steel = 260 tons, Con. = 206 m3) |
Design overview | Installation water depth = '-7.0 m, design wave height = 1.66 m (H1/3) |
Features/functions | Dolphin mooring, building, ramp type connecting bridge |
Remarks | Ship Safety Law and Building Standard Law applied |