Composite deck slab bridges
River bridges
River bridges are original steel-concrete composite deck slab bridges of JFE Engineering that use T-shaped steels with a filling knot-like projection on the outside surface of the flange as a shear connector. Since shear connectors such as studs are no longer required, this structure makes it possible to construct bridges with low girder height that cannot be constructed with other structures. Since this bridge structure was first practically applied, we have constructed more than 420 river bridges to date.
Simple girder bridges are compatible with spans of up to about 40 meters and skew angles of more than 45 degrees, and continuous girder bridges can also be constructed. As a result, the application of our river bridge structure is expanding significantly to road bridges over rivers, overbridges, etc.
実績例

Name | Shimizu crossing bridge |
---|---|
B live load | |
Bridge length | 60.2m |
Width | 10.9m |
Skew angle | 83° |
Structure height | 1.53m |
Structure height/ Effective span ratio |
1/23 |
Anticorrosive treatment | metal spraying |
Year completed | 2022 |

Name | Henmurosawa bridge |
---|---|
B live load | |
Bridge length | 29m |
Width | 11.25m |
Skew angle | 83° |
Structure height | 2.3m |
Structure height/ Effective span ratio |
1/35 |
Anticorrosive treatment | Weather-resistant steel |
Year completed | 2020 |

Name | Sakura bridge(first) |
---|---|
B live load | |
Bridge length | 32.7m |
Width | 9.88m |
Skew angle | 90° |
Structure height | 2.3m |
Structure height/ Effective span ratio |
1/40 |
Anticorrosive treatment | Weather-resistant steel + CUPTEN COAT |
Year completed | 2020 |

Name | Kochidori River (UR Saitama) |
---|---|
B live load | |
Bridge length | 37m |
Width | 22.5m (widest portion: 47m) |
Skew angle | 90° |
Structure height | 1.32m |
Structure height/ Effective span ratio |
1/26 |
Anticorrosive treatment | Weather-resistant steel + RusCor (landscape grade) |
Year completed | 2011 |

Name | Mizonoguchi Bridge (Kinki Regional Development Bureau) |
---|---|
B live load | |
Bridge length | 32m |
Width | 25m |
Skew angle | 83° |
Structure height | 1.00m |
Structure height/ Effective span ratio |
1/31 |
Anticorrosive treatment | Weather-resistant steel + CUPTEN COAT M |
Year completed | 2011 |

Name | Ebisu Bridge (Ugi, Kumamoto Prefecture) |
---|---|
B live load | |
Bridge length | 38m |
Width | 13.75m |
Skew angle | 60° |
Structure height | 1.12m |
Structure height/ Effective span ratio |
1/33 |
Anticorrosive treatment | Aluminum-zinc spray coating |
Year completed | 2010 |

Name | Tokiwa Bridge (Niigata Prefecture) |
---|---|
B live load | 3-span continuous girder |
Bridge length | 107 m (span: 37 + 33 + 37m) |
Width | 15.8m |
Skew angle | 84° |
Structure height | 1.44m |
Structure height/ Effective span ratio |
1/25 |
Anticorrosive treatment | C-5 series paint |
Year completed | 2009 |

Name | Atago Bridge (Okazaki, Aichi Prefecture) |
---|---|
B live load | |
Bridge length | 23m |
Width | 7.2m |
Skew angle | 80° |
Structure height | 0.97m |
Structure height/ Effective span ratio |
1/22 |
Anticorrosive treatment | Weather-resistant steel + CUPTEN COAT M |
Year completed | 2005 |