Rigid-frame (Ramen) bridges
Rigid-frame (Ramen) bridges are a bridge type made up of groups of rigidly connected members on which bending moment, axial force, and shear force work at the same time. Rigid-frame bridges are grouped into Vierendeel bridges, which are considered superstructure girder bridges, and bridges of superstructure-substructure integral structure. Bridges of superstructure-substructure integral structure include braced rigid-frame bridges, V-leg rigid-frame bridges, and viaducts in urban areas. The applied spans of rigid-frame bridges are about 40 to 80 meters in general. JFE Engineer has been involved in the construction and erection of many rigid-frame bridges.

Construction examples
Ohashi Junction

| Year completed | 2010 |
|---|---|
| Bridge type | Rigid-frame bridge |
| Client | Metropolitan Expressway Co., Ltd. |
| Bridge length | (Ramp B) 310m, (Ramp D) 214m |
| Features |
|
Ebinakita Junction Ramp F Bridge

| Year completed | 2005 |
|---|---|
| Bridge type | Rigid-frame bridge |
| Client | Central Nippon Expressway Company Limited |
| Bridge length | 187m |
| Features |
|
Yokooji Viaduct

| Year completed | 2005 |
|---|---|
| Bridge type | 3-span continuous steel deck slab rigid-frame bridge |
| Client | Hanshin Expressway Public Corporation |
| Bridge length | 224m |
| Features | Weather-resistant bridge (chemical conversion treatment applied) |
Kotsuki Bridge

| Year completed | 2002 |
|---|---|
| Bridge type | 3-span continuous composite rigid-frame bridge |
| Client | Japan Highway Public Corporation |
| Bridge length | 125m |
| Features | Superstructure-substructure integral bridge |
Section KJ141

| Year completed | 2001 |
|---|---|
| Bridge type | 5-span continuous rigid-frame bridge |
| Client | Metropolitan Expressway Public Corporation |
| Bridge length | 234m |
| Features | Rigid frame connected with steel piers |
Toyoyama (No. 5) Section

| Year completed | 2000 |
|---|---|
| Bridge type | 3-span continuous steel deck rigid-frame bridge |
| Client | Nagoya Expressway Public Corporation |
| Bridge length | 325m |
| Features | Rigid frame connected with steel piers |
Nishizawa Bridge

| Year completed | 1995 |
|---|---|
| Bridge type | 5-span continuous V-pier rigid-frame bridge |
| Client | Yamanashi Prefecture |
| Bridge length | 360m |
| Features | Curved V-leg rigid frame |
Sanpodani Bridge No. 4

| Year completed | 1994 |
|---|---|
| Bridge type | Braced rigid-frame bridge |
| Client | Ministry of Land, Infrastructure, Transport and Tourism Kyushu Regional Development Bureau |
| Bridge length | 78m |