To an Japanese pageTo an Chinese page
Sitemap & Contact
HOME Products & Services Proposals for Our Customers R&D News Release Company Profile
JFE Conteiner Hangar Movie
RAPIDAS Movie
CYCLE TREE
Ballast Water Management System:JFE BallastAce
Energy
Pipeline systems
Storage base systems
Process plants
On-site energy supply
District heating and cooling
Cogeneration
Geothermal energy utilization systems
Inspection diagnosis and maintenance systems
Water&Waste Water
Environment
Waste To Energy Plant
Flue Gas and Ash Treatment Equipment
Sustainable Energy Plant
Gas Engine Power Generation System
Steam Turbine
Ballast Water Management System:JFE BallastAce
Steel Structure
Bridges
Hybrid caissons
Steel frames
Industrial Machinery
Container crane
Steam turbine
Cycle Tree: Multi-level Mechanical Bicycle Parking System
Rapid Access System for EV Charge “RAPIDAS”
     

Headline News

[04/24/2012]

JFE Engineering was awarded for Steam Supply Facilities for Geothermal Power Plant in Indonesia

[03/14/2012]

Installation of Rapid Charging System for EV (Electric Vehicles) in US
– JFE Engineering’s “RAPIDAS” – Adopted as the World’s Most Innovative Technology!! –

[10/05/2011]

A Compilation of Advanced Solar Energy Power Generation Technologies at the Yokohama Head Office
– Announcing the Completion of JFE Engineering’s Solar Techno Park –

[09/28/2011]

Success in Commercialization of the World’s First Super Rapid Charger for Electric Vehicles
– Revolutionary Charging System that Can Charge in Only Few Minutes Opens the Future of EV –

[08/04/2011]

Success in Development of Tower-type Concentrating Photovoltaic System and Outlook for Practical Application
– Achieves the World’s Highest Level of Power Generating Efficiency –