Girder bridges

Girder bridges are the simplest bridge type in structure and consist of steel beams shaped to an I-section or box section, called a plate girder bridge or a box girder bridge, respectively. Girder bridges are comprised of deck slabs, on which vehicles and people pass, and of main girders supporting the deck slabs. Deck slabs include RC deck slabs, steel deck slabs, composite deck slabs, and PC deck slabs. Bridges where the deck slabs and the main girders work together to resist loads are called composite girder bridges, and bridges designed to resist loads with the main girders only are called non-composite girder bridges. In general, effective spans of about 25 to 150 meters are applied, but the Costa e Silva Bridge (Brazil) was built with the longest effective span of 300 meters. JFE Engineering has the most experience in the manufacture and construction of bridges of this type.

Construction examples

Name New Takatsuno Bridge
Year completed 2021
Bridge type 3-span box girder
Client Shimane Prefecture
Bridge length 246m
Features The bridge was erected from the riverbed on the right bank using the launching erection method, and the remaining girders were erected from both banks using the truck crane venting method.
Name Nagoya West Junction
Year completed 2021
Bridge type 8-span continuous steel slab box girder, 3-span continuous non-composite box girder (precast PC slab)
5-span continuous non-composite plate girder (composite slab), etc.
Client West Nippon Expressway Company Limited, Nagoya Sales Office
Bridge length 1945.5 m (total bridge length of construction section)
Features Due to the construction limit with the adjacent road, the girder height was reduced to the limit, which lower rigidity of girders. As a result,the bridge was erected with a large amount of deflection.
In order to minimize social impacts such as traffic restrictions, a batch erection using multi-axle bogies and large cranes was mainly adopted.
Name New Ooigawa Bridge
Year completed 2021
Bridge type 5-span continuous non-composite box-girder bridge
Client Ministry of Land, Infrastructure and Transport Chubu Regional Development Bureau
Bridge length 318.4m
Features Composite slab panels were erected by two parties on each side to shorten the construction schedule. As the result of the effort, the erection was completed by the end of May during the non-water season.
Name Expressway Yokohama Loop Northwest Route, Aoba Area, Upper Section and Piers (Part 1)
Year completed 2020
Bridge type 3 continuous RC slab box girders, continuous steel slab box girders, continuous composite slab box girders, 11 steel piers
Client Metropolitan Expressway
Bridge length 950m (total bridge length of construction section)
Features The truck crane venting method and multi-axle bogies were used to erect the bridge in batches under traffic restrictions on the motorway adjacent to and directly below the bridge.
Name Haruta 3 viaduct
Year completed 2020
Bridge type 3-span continuous non-composite box-girder bridge
Client Chubu Regional Development Bureau, Ministry of Land, Infrastructure and Transport
Bridge length 191m
Features Night-time road closure restrictions were implemented at the adjacent prefectural road intersection. The bridge was erected using the truck crane venting method.
Name Akasaka North No. 1 Viaduct
Year completed 2019
Bridge type 5-span continuous non-composite box-girder bridge
Client Chubu Regional Development Bureau, Ministry of Land, Infrastructure and Transport
Bridge length 370m
Features Two of the five bore spans were erected using the launching erection method and the rest of three using the truck crane venting method.
Name Kurashiki Minato Bridge
Year completed 2016
Bridge type Bridge type 7-span continuous box girder and two other girders
Client Ministry of Land, Infrastructure and Transport Chugoku Regional Development Bureau
Bridge length 384m
Features Al + Mg metal spray coating with long-term anti-corrosion performance was applied to the outer surface. In addition, anti-corrosion bolts were used for the on-site joints.

Name Kannonji Viaduct
Year completed 2011
Bridge type (Bridge No. 5) 3-span continuous open-section box girder
Client Ministry of Land, Infrastructure, Transport and Tourism Kinki Regional Development Bureau
Bridge length Bridge No. 3: 118m, Bridge No. 5: 196m, Bridge No. 8: 219m
Features Steel-concrete composite deck slabs used
Name Iwo Jima Bridge
Year completed 2011
Bridge type 3-span continuous steel deck curved box girder
Client Nagasaki Prefecture
Bridge length 480m
Features Marine single-operation erection of large block by floating crane
(Maximum block length: 163 m)
Name Kizugawa Bridge
Year completed 2007
Bridge type 6-span continuous composite open-section box girder
Client Ministry of Land, Infrastructure, Transport and Tourism Kinki Regional Development Bureau
Bridge length 439m
Features
  • Open-section box girder bridge
  • U-rib composite deck slab
  • Weather-resistant bridge (CUPTEN COAT M)

Related technology