JFE Engineering’s hybrid pontoon is  a RC hybrid type pontoon that consists of securely integrated composite slabs of a steel plate and reinforced concrete, as well as steel members such as steel plates and shaped steel. The use of high-strength composite slabs makes it possible to reduce the thickness and weight of slabs as is the case with hybrid caissons. Steel pontoons using only steel plates, not composite slabs, for the external walls can be further reduced in weight, and as a result, the draught under their own weight can be reduced, and steel pontoons are fully compatible with installation conditions in shallow water.
The floating bodies of all JFE Engineering’s pontoons are covered with composite slabs or steel plates, which provide a full hermetic structure.

Construction examples

Name of construction work
Floating pier in Kanda Port
Client
Fukuoka Prefecture
Purpose/Function
Floating pier for mooring fishing vessels, etc.
Year completed
2009
Dimensions (m)
52 (length) × 41.8 (width) × 22 (height)
Quantity (/case)
Dead weight = 156 tons
Features
Mooring method: Pile mooring
Structure type: Steel
Name of construction work
Fukugawa Fishing Port development work (2nd section)
Client
Shin-nanyo, Yamaguchi Prefecture
Purpose/Function
Floating pier for fishing vessels
Year completed
2003
Dimensions (m)
Height = 2.45, width = 3.0, length = 32.1, draught = 1.65
Quantity (/case)
Dead weight = 160 tons
Design overview
Installation water depth = ‘-2.5 m, design wave height = 0.5 m
Features
Pile mooring
Name of construction work
Floating pier construction work in Zamami Port
Client
Okinawa Prefecture Nanbu Regional Public Works Office
Purpose/Function
Floating pier for berthing of high-speed vessels
Year completed
2002
Dimensions (m)
Height = 2.2, width = 10.0, length = 40.0, draught = 1.3
Quantity (/case)
Dead weight = 233.4 tons (steel = 142.1 tons, Con. = 37.3 m3)
Design overview
Installation water depth = ‘-4.0 to -5.3 m, design wave height = 0.9 m (H1/3)
Features
Pile mooring, shed, ramp type connecting bridge
Name of construction work
Sakate Fishing Port repair work
Client
Toba, Mie Prefecture
Purpose/Function
Floating pier for berthing of ferries
Year completed
2002
Dimensions (m)
Height = 2.3, width = 9.0, length = 25.0, draught = 1.4
Quantity (/case)
Dead weight = 302.6 tone (steel = 56.2 tons, Con. = 93.2 m3)
Design overview
Installation water depth = '-2.5 to -3.5 m, design wave height = H = 0.4 m
Features
Chain mooring, shed, ramp type connecting bridge
Name of construction work
Sea fishing park maintenance work
Client
Osaki-cho, Hiroshima Prefecture
Purpose/Function
Fishing pier
Year completed
2001
Dimensions (m)
Height = 1.5, width = 5.0, length = 48.0, draught = 0.5
Quantity (/case)
Dead weight = 76.8 tons
Design overview
Installation water depth = '-7.0 m, design wave height = 0.93 m (H1/3)
Features
Chain mooring, ramp type connecting bridge
Name of construction work
Pier construction work in International Exchange Zone of Yokohama Minato Mirai 21 area
Client
Port and Harbor Bureau, City of Yokohama
Purpose/Function
Waiting room/Restaurant
Year completed
1991
Dimensions (m)
Height = 3.2, width = 24.0, length = 24.0, draught = 2.0
Quantity (/case)
Full load displacement = 1200 tons (steel = 260 tons, Con. = 206 m3)
Design overview
Installation water depth = '-7.0 m, design wave height = 1.66 m (H1/3)
Features
Dolphin mooring, building, ramp type connecting bridge
Remarks
Ship Safety Law and Building Standard Law applied