Steel caissons are caissons with steel members for the outer walls and bulkheads and SRC or steel members for the bottom plate. They are excellent for mid-partition revetments where long-term corrosion protection is not required, in terms of economy and rapid construction.

Features of the construction method

  1. The small amount of concrete used means that the weight of the caisson can be reduced,making it lighter and longer.
  2. The amount of concrete work is small, shortening the fabrication work.

Pneumatic Caisson Method (Overview of Constructin Method)

In this method, a caisson is sunk into the ground or sea while excavating soil and sand from the bottom of the caisson, which is constructed on the ground when constructing a shaft or pier foundation.
(The caisson is excavated and discharged without groundwater infiltration by sending high-pressure air into the working chamber at the bottom of the caisson.)

Pneumatic Caisson Method (Construction Examples)

Construction examples

Name of construction work Steel caisson fabrication for Sumida River Bridge, Loop No. 2
Client Tokyo Metropolitan Government
Purpose/function Pier foundation
Year of construction 2012
Dimensions Length 39.0 x Width 10.0 x Height 11.0 m
Number of units 1 unit
Weight
Steel weight 300 t/unit
Concrete volume 215 m3 inside the blade
Design overview Installation depth -4.0 m
Features/functions Working chamber 868 m3
Name of construction work Fushiki Toyama Port (Shin-Minato area) Road (East-West Line)Bridge (P22) Foundation works
Client Hokuriku Regional Development Bureau, Ministry of Land, Infrastructure and Transport
Purpose/function Bridge pier foundation
Year of construction 2004
Dimensions Length 29.0 x Width 13.0 x Height 11.5 m
Number of units 1 unit
Weight
Steel weight 400 t/unit
Concrete volume 889 m3inside the blade
Design overview Installation depth -47.0 m
Features/functions Working chamber 704 m3
Name of construction work Temporary seawall fabrication for Naoetsu Port, West side
Client Niigata Prefecture
Purpose/function Temporary Seawall
Year of construction 1999
Dimensions Length 74.8 x Width 5.2/7.2 x Height 6.5 m
Number of units 1 unit
Weight 843 t/unit
Steel weight 215 t/unit
Concrete volume 344 m3/unit
Design overview Installation depth -5.0 m