JFE Engineering Corporation
HOME Products & Services Proposals for Our Customers R & D News Release Company Profile
Site Map Contact
MENU
Products & Services
  Energy Industries Engineering Division
  Environmental Industries Engineering Division
  Water and Waste Water Engineering Division
  Steel Structure Engineering Division
  Industrial Machinery Engineering Division
 
JFE Group
JFE Holdings
JFE Steel
JFE Urban Developement
Kawasaki Microelectronics
JFE R&D

CYCLE TREE: Multi-level Mechanical Bicycle Parking System

Environmental Industries Engineering Division
This is an innovative mechanical parking system for bicycles. It is a fully automated system that enables simple and speedy entry/exit of a large number of bicycles in a limited space. It insures safety by "man-machine separating concept", or by separating a user from movable area of parking machine.
By providing various detectors and devices at the entry/exit area, it further achieves user safety. For example, a sensor is provided at the bicycle entry point; this perceives arrival of the bicycle on the point and its signal makes the parking system ready for bicycle entry. Two safety bars are installed in front of the entry gate, which prevent entering of the user into the gate.

キExcellent Product Award by The Japan Society of Mechanical Engineers (2007)

Features
キJFE installed the largest number of mechanical bicycle parking systems in Japan (as of September 2009).
キJFE installed a large number of the systems near the train station areas that require frequent parking of many users.
キFor construction of underground parking systems, special method is applied to secure water-tightness and earthquake resistance.
キIC tag system enables speedy location of the bicycle, and convenience for short time users is considered.


Project Record

Examples: Underground Parking Systems
Kasai Station Bicycle Parking Lot (Tokyo)
Kasai Station Bicycle Parking Lot (Tokyo)
Capacity 6,480 bicycles in Cycle Tree storage spaces, 9,400 bicycles in total
Start of Operation 2008
Type & Structure Mechanical underground parking system
18 bicycles/rack x 10 racks x 36 stations (21 in the east, 15 in the west)
キLargest underground mechanical parking system in the world
キ"Urban Ring" construction method was applied to secure excellent water-tightness and earthquake resistance within a short construction period
Motokajicho Bicycle Parking Lot (Sendai)
Motokajicho Bicycle Parking Lot (Aoba Ward, Sendai City)
Capacity 1,008 bicycles
Start of Operation 2008
Type & Structure Mechanical underground parking system
21 bicycles/rack x 16 racks x 3 stations
キSystem for an urban park in downtown area with entry/exit booths on the surface ground.
キConstruction method for hard ground was applied to secure excellent water-tightness and earthquake resistance.
キAvailable for short time users
Hirai Station Bicycle Parking Lot (Tokyo)
Hirai Station Bicycle Parking Lot (Tokyo)
Capacity 756 bicycles
Start of Operation 2009
Type & Structure Mechanical underground parking system
18 bicycles/rack x 14 racks x 3 stations
キFirst system installed in the rotary area of the train station
キNo full time operating staff is required.
キSecurity measures at entry/exit booths
Ichinoe Station Bicycle Parking Lot (Tokyo) - under construction
Ichinoe Station Bicycle Parking Lot (Tokyo) - under construction
Capacity 756 bicycles
Start of Operation 2011 (plan)
Type & Structure Mechanical underground parking system
18 bicycles/rack x 14 racks x 3 stations
キNo full time operating staff is required.
キConstruction and installation in a narrow working space in front of a subway station
 Hankyu Nishinomiya-Kitaguchi Station Bicycle Parking Lot (Nishinomiya)
 Hankyu Nishinomiya North Station Bicycle Parking Lot (Kobe)
Capacity 414 bicycles
Start of Operation 2010 (plan)
Type & Structure Mechanical underground parking system
18 bicycles/rack x 11 racks x 1 station
18 bicycles/rack x 12 racks x 1 station
キFirst installation in the western Japan
キConstruction and installation in a narrow working space in front of a station


Examples : Above Ground Parking Systems
Noborito Station North Bicycle Parking Lot (Kawasaki)
Noborito Station North Bicycle Parking Lot (Tama Ward, Kawasaki)
Capacity 594 bicycles
Start of Operation 2009
Type & Structure Mechanical above ground parking system
18 bicycles/rack x 11 racks x 3 stations
キEffective utilization of a narrow space near the station
キSafety consideration for construction work near the railway
Funabori Station Central Bicycle Parking Lot (Tokyo)
Funabori Station Central Bicycle Parking Lot (Tokyo)
Capacity 1,476 bicycles
Start of Operation 2006
Type & Structure Mechanical above ground parking system
18 bicycles/rack x 14 racks x 5 stations
18 bicycles/rack x 12 racks x 1 station
キFirst in the application of the IC tag system
キEffective utilization of a narrow space
キConvenient location of the parking system

Manner of operation

Entry & Exit
Simple and speedy entry/exit operation, in combination with the IC tag system. Japan's first mechanical bicycle parking system. Smooth entry/exit during commuting hours in the morning and the evening. Easy operation by voiced guidance on the display panel.
The IC tag is attached to the bicycle at the registration.

Entry
キSet the bicycle at the entry point and push the entry button.
キEntry starts immediately after the IC tag reader instantly reads the IC tag; reading completes within only 5 seconds.
Push the entry button Set the bicycle. The gate opens and it stores the bicycle automatically.
1. Set the bicycle. 2. Push the entry button 3. The gate opens and it stores the bicycle automatically.

Exit
キInsert the magnetic card through the operation panel. The bicycle comes out automatically. The right station to retrieve the bicycle will be always displayed even when a wrong station is entered.

 
Go To TOP Terms and Conditions